NATO

Maintenance of industrial structure

Installation of mobile scaffolding structure of 12 meters diameter for the maintenance of gas pipeline. The movement of the structure is controlled by a hydraulic electric motor. The maintenance works included sandblasting and radiography of the interior shell of the gas tank. The structure was made and adapted specifically for the needs of the specific workflow.